Clearing & Grubbing
Pad Preparation
Exterior Footing Excavation
Placement of Exterior Footings
Ground Plumbing & Formwork
Completed Foundation Preparation
Foundation Slab Concrete Placement - 3am Pour
Concrete Pump
Concrete Air Testing
Concrete Slump Test
Concrete Cylinder Testing Samples
Concrete Slab Placement
Concrete Slab Placement
Concrete Pumping
Concrete Slab Placement
Concrete Slab Placement
Northeast elevation.
Fire stair tower.
Second floor rough carpentry.
Second floor rough carpentry.
Concrete masonry elevator shaft.
Front entry post/beam connection.
Fire stair bolted/welded connections.
Second floor rough carpentry.
Third floor framing elevation.
Third floor framing view.
Fourth floor framing elevation.
Interior guest room.
View down third floor corridor.
Fire stair treads and landing pans are filled with concrete.
Loading roof trusses onto the fourth floor walls.
Checking the nail spacing on shear walls to ensure maximum spacing requirements are met.
Fourth floor and roof framing complete.
Front elevation.
Roof trusses.
Roof trusses above fourth floor corridor.
Value Place Hotel - Odessa, Texas
Completed December 2012
(click on photo for larger image)